Macioce v. ZHB of the Borough of Baldwin
850 A.2d 882, (Pa. Cmwlth. 2004).
A landowner and AT&T wireless claimed that the Borough was impermissibly prohibiting them from erecting a wireless tower where less then 1% of the land in the township could support a tower under the current zoning scheme. The test to determine if there is a de facto taking when a plaintiff alleges that the township is not allowing its "fair share" of a certain use is that there must be a very small area zoned for the particular use and the needs of the residents are not being adequately served.
While the landowner showed that the available land to erect wireless towers was small, he did not satisfy their burden of proving that the needs of the residents for wireless communication were not being met. AT&T wanted to build this tower because this was an area of "unreliable service." But there were, in fact, already two towers in the township. There was nothing else on the record to determine the needs of the resident in the township.
DISCLAIMER:
This site is designed to provide summary review of selected Pennsylvania and Federal Court decisions related to land use and land use controls. The information contained herein, although produced by professionals, is not intended to render any legal service. Nor should the materials herein be utilized as a substitute for professional services. If legal advice or other expert assistance is required, the service of an attorney or other professional should be sought. DCED makes no representations, warranties or guarantees as to the accuracy, completeness or suitability of the information provided herein.

Back to Top |